It was projected and designed by Ivan Antic (1923-2005) and construction took place from 1973-75.

The highlight of the building is the restaurant supported on 19 m cantilevers that gives a special feature to this architectural piece!

The roof of the covered Olympic swimming pool is made of prestressed concrete hyperbolic parabolic shell, 7 cm thick on the rhombus base, with the span over the longer diagonal 107 m and over the shorter 60 m.
In the lowest points of the roof shell the inclined columnal "abutments'' are formed witch are interconnected by prestressed concrete tie beams.
A little bit of renobvation is planned and going on.

all photo's by www.ostarchitektur.com
25 May Sportcenter
Tadeuša Košćuška 63,
Belgrad
I remember the first time I saw this building! I don't know why, but it made me smile!
ReplyDeleteAdam
Thank you Adam. Indeed the building looks like a friendly creature from cartoon network!
ReplyDelete